New production line to offer advanced connectivity
Huber+Suhner and CL Electrical Controls have launched a new production line in Bristol to meet the UK's growing 5G demand with Low Loss Corrugated cable assemblies.
MAIN POINTS
- Huber+Suhner and CL Electrical Controls expand their partnership with a new production line.
- The production line is located in Bristol, UK.
- It focuses on Low Loss Corrugated (LISCA) cable assemblies.
- The initiative addresses the increasing demand for 5G connectivity in the UK.
TAKEAWAYS
- The new production line enhances the UK's infrastructure for 5G technology.
- Collaboration between Huber+Suhner and CL Electrical Controls began in 2020.
- The initiative signifies a strategic expansion in advanced connectivity solutions.
- Bristol becomes a key location for 5G cable assembly production.